← Back to services

Future readiness: OPC UA, AAS and the Digital Product Passport

Once the system is stable, I prepare it for Industry 4.0: OPC UA integration, Asset Administration Shell (AAS), and technical preparation for regulatory requirements such as the Digital Product Passport (DPP).

Process

  1. Prerequisite: a stabilized system. As long as releases are risky, a new interface only moves the problem outward.
  2. Goals: we clarify which data the system needs to provide for customers, machines, and regulatory evidence.
  3. Interface: OPC UA integration or Asset Administration Shell (AAS), started on one bounded use case.
  4. Evidence: preparation for requirements such as the Digital Product Passport (DPP), as far as regulation is settled today.

Result

  • A working interface for a defined use case.
  • A documented data model that carries over to further machines and products.
  • A reliable statement of what is still technically missing for the Digital Product Passport.

Price range

After stabilization · On request

I set the fixed price after the initial assessment.

Fixed price and documented acceptance.

Who it is not for

  • Systems that do not yet run stably. Stabilization comes first.
  • Full MES or ERP rollouts. I build the interfaces, not the third-party systems.
  • Legal advice on regulatory requirements. I prepare the technical side; the legal assessment stays with you.

How ready is your system for the next release?

The assessment classifies release risks in your business-critical software as stable, elevated risk, high risk, or critical.

Start Release Risk Check →

No account needed. Diagnostic report by email.